How purchasing teams use PartCensus.

Four checks across an industrial control panel BOM, without changing your ERP or sharing negotiated prices upfront.

Book a demo

Catch EOL and NRND parts before they stall a build.

A manufacturer notice marks the PLC-1769-EX as not recommended for new designs (NRND). The last-time buy is Q3, and the official successor is PLC-1769-V2.

Engineering: Review the successor

Check fit, ratings, and UL/CSA compliance before approving the replacement.

Inspect the PLC in the BOM preview
Lifecycle noticeNRND

Compact PLC Controller

PLC-1769-EX
Last-time buy
Q3
Official successor
PLC-1769-V2
Approval owner
Engineering

Spot open-catalog stock and MOQ traps.

The build needs 12 PS24-10A power supplies. The distributor requires an order of 25, while the open catalog has all 12 in stock.

Purchasing: Compare order totals

The higher unit price still saves $848 CAD on the order before freight, tax, and duty.

Inspect the power supply quote
Quote comparisonSave $848 CAD

24V DIN-Rail Power Supply

PS24-10A 12 units
Order costs before freight, tax and duty
SourceBuy qtyUnitTotal
Distributor25$80$2,000
Open catalog12$96$1,152

Flag tariff and origin gaps before signing the PO.

The records for the SW8-DIN-M switch don’t confirm where it was made. That leaves the applicable duty open.

Purchasing: Confirm origin and duties

Ask the supplier for proof of origin and CUSMA paperwork. Check the tariff code and rate before placing the order.

Inspect the switch’s origin flag
Tariff & origin reviewOrigin missing

Managed Industrial Switch

SW8-DIN-M
Tariff classification
Confirm before PO
CUSMA eligibility
Request documentation

Check distributor quotes against real delivery history.

The quote promises the SR24-2C safety relay in 10 days. Past receipts took 22–28 days, past the build deadline on Day 14.

Purchasing and Engineering: Verify options

Purchasing confirms delivery. Engineering checks the SR24-2D alternate for fit, ratings, and certification.

Inspect quoted vs. actual lead time
Delivery historyLate risk

Safety Relay Module

SR24-2C
Day 14
Quoted 10 days
Past receipts 22–28 days

See PartCensus on your own BOM.